Genset and burner operated simultaneously using walnut shells as feedstock - November 2007
Met California emissions standards for distributed generators - May 2006.
Made renewable liquid fuel from nitrogen-diluted producer gas - December 2005.
Achieved 24/6 continuous operation objective with new BioMax 50 system - September 2005
First integration of Renewable Fuel Gas Generator with commercial burner - March 2004
BioMax 15 demonstrated for Chief Forester, Dale Bosworth, in San Bernadino Forest - February 2004
First gasification of biomass with fluid bed gasifier - January 2004
BioMax 15 product validation units installed at:
- SBS Wood Shavings in Ruidoso, NM - October 2002
- North Park High School in Walden, CO - September 2003
- Zuni Furniture Enterprise in Zuni, NM - October 2003
First Renewable Fuel Gas Generator installed at Mississippi State University - August 2003
Community Productive Use Platform installed - December 2002
CPC powers solid oxide fuel cell using producer gas from three different renewable, abundant, biomass sources --- wood chips, pecan shells and coconut shells. Power output 70% of pure hydrogen - August 2002.
BioMax interconnected to PG&E grid. Believed to be first ever small modular biopower system in US to be interconnected. - June 2002
CPC receives Development Marketplace award from World Bank - January 2002
BioMax receives Asian Innovation Award - October 2001
Trailer-mounted BioMax commissioned in Hoopa, CA - August 2001
BioMax powers productive use equipment in Alaminos, Philippines - September 2001
Power generation in Alaminos, Philippines as part of BioMax commissioning - March 2001
1 MWhr generated during endurance run prior to shipment of BioMax to Philippines - January 2001
Fully-automated run of BioMax system - December 2000
Power from PV/LPG hybrid to the village of Alaminos First Christmas Eve Mass in history of community - December 2000
Full power run of BioMax system on coconut shells - July 2000
Use of CPC's EnergySwitchä to deliver AC power to a rural customer on a commercial basis- March 2000
Dedicated new Product Development Facility in Littleton, CO November 1999
Operation of CPCs new "hot-gas" non-polluting power gasifier September 1999
Strategic relationship with a market aggregating customer (Shell Solar BV) - June 1999
Operation of an STC Stirling engine battery charger with a CPC gasifier January 1999
In-country manufacturing relationship (Bakrie Group) - October 1997
Renewable Energy Service Company (Indonesia) - March 1997